Metrolinx released a glimpse of what the Don Valley’s future may look like for the first time, once Ontario Line construction is done.
Renderings released Friday by the provincial transit agency in charge of building the 15.6-kilometre line show the future Don Valley Crossing bridge, which will span at least 400 metres over the valley and freeway between Cosburn and Thorncliffe Park stations, running parallel to the Millwood Overpass Bridge. It will be approximately 34 to 38 metres high, according to a Metrolinx spokesperson.